 |
|
|
|
IREO The Grand Arch |
|
 “The
Grand Arch” from Ireo is designed to be Gurgaon’s new landmark residential complex.
Spread over almost 20 acres, ....
|
|
|
 |
|
|
|
|
|
Unitech Nirvana Country2 |
|
 The
Moment has now arrived. Nirvana Country 2 is for those who distinguish themselves
from the masses. Independent,.....
|
|
|
 |
|
|
|
|
|
DLF Park Place |
|
 The
sprawiling 30-acre DLF Park Place has been planned keeping some very important people
in mind. You and your loved ones....
|
|
|
 |
|
|
|
|
|
IREO Uptown |
|
 U‘Ireo
Uptown – Home to young dreams’. 3 side open (2, 3 & 4 BHK) apartments with 10 ft
ceiling height to give .....
|
|
|
 |
|
|
|
|
|
DLF Town Houses |
|
 DLF
has just launched few Townhouses in their recently sold DLF New Town Heights Project
at Sector 86, Gurgaon....
|
|
|
 |
|
|
|
|
|
Commonwealth Games village 2010
|
|
 A
prime location just minutes away from the central business district - Connaught
Place, the Commonwealth Games ....
|
|
|
 |
|
|
|
|
|
Ramprastha The Edge Towers
|
|
 THE
EDGE TOWERS part of Ramprastha City a 151 acres integrated township in sector 37D
Gurgaon...
|
|
|
 |
|
|
|
|
|
DLF Express Greens
|
|
 DLF's
new residential project "Express Greens" in Sector - M1, Manesar, Gurgaon. A reflection
of novel architecture ,....
|
|
|
 |
|
|
|
|
|
|
 |
|
Residential Projects > Unitech Sunbreeze, Gurgaon
|
 |
 |
|
Projects style
|
|
Premium Apartments |
|
Location |
|
Gurgaon |
|
Projects Status |
|
On booking process |
|
|
|
|
|
|
Overview
|
The airy home at Sunbreeze are designed
expertly to let you feel close to nature, even when you are indoors. As you
take a walk along the landscaped greens in The outdoors, getready to lose yourself
in the aura of nature's rhapsody to connect with your inner-self.
|
|
A secret garden od experiences to be
unreservedly savoured, Sunbreeze redefines the essence of an invigorating residential
living.
|
|
Key Features
|
- Gymnasium
- Multipurpose hall for meditation, Yoga & Gatherings
- Swimming Pool
- Changing Rooms
- Kid's play area
-
Pantry
- 24 x 7 Power Back-Up
|
Floors
|
FLOORS PLAN |
|
|
1826 Sq. ft. (Type Y1) 4 Bedroom, 4TSQ + Store |
|
|
1807 Sq. ft. (Type Y2) 4 Bedroom, 4 TSQ
|
|
|
1656 Sq. ft. (Type Y3) 4 Bedroom, 4 TSQ + Store
|
|
|
1628 Sq. ft. (Type Y4) 4 Bedroom, 4 TSQ
|
|
|
1501 Sq. ft. (Type Z1) 3 Bedroom, 3 TSQ
|
|
|
1501 Sq. ft. (Type Z2) 3 Bedroom, 3 TSQ
|
|
|
1467 Sq. ft. (Type Z3) 3 Bedroom, 3 TSQ
|
|
|
1100 Sq. ft. (Type Z4) 2 Bedroom, 2T + Study
|
|
|
1337 Sq. ft. (Type Z5) 3 Bedroom, 3 TSQ
|
|
|
1337 Sq. ft. (Type Z6) 3 Bedroom, 3 TSQ
|
|
|
1303 Sq. ft. (Type Z7) 3 Bedroom, 3 TSQ
|
|
|
968 Sq. ft. (Type Z8) 2 Bedroom, 2T + Study
|
|
|
|
Spec
|
STRUCTURE |
|
Structure |
RCC framed earthquake resistant structure |
|
WALL FINISH |
|
Internal |
Oil bound distemper |
|
Srevant Quarter/Store |
Oil bound distemper |
|
External |
Exterior paint |
|
Lift Lobbies |
Combination of paint and stone/tiles |
|
FLOORING
|
|
Living/Dining/Bedrooms |
Vitrified tiles |
|
Sreavant Quarter/Store |
Ceramic tiles |
|
Lift Lobbies |
Stone/Vitrified tiles |
|
KITCHEN |
|
Flooring |
Ceramic tiles |
|
Dado |
Ceramic tiles till 600 mm above counter area, rest painted with oil bound distemper |
|
Fitting |
Granite counter with stainless steel sink and drain board |
|
DOORS
|
|
Main Entry |
Seasoned hardwood frame with European style moulded shutter |
|
Internal Doors |
Seasoned hardwood frame with European style moulded shutter |
|
TOILETS
|
|
Flooring |
Ceramic tiles |
|
Dado |
Select ceramic tiles upto 2100 mm |
|
Fitting |
Granite counter, white sanitary fixtures, single lever CP fittings, pipe lines for
geysers |
|
BALCONIES |
|
Flooring |
Ceramic tiles |
|
Windows/External Door |
Powder coated/anodised aluminium glazing |
|
Electrical |
Copper electrical wiring in concealed conduits and modular switches |
|
Power Back-Up |
24 x 7 power back-up |
|
Communication |
TV and telephone points in living room & master bedroom only intercom facility
to each flat in living room |
|
All floorplan, sitemap, specifications, amenities, facilities and perspective views
are tentative in nature and are subject to revision. |
|
|
|
Price List
|
PRICE LIST (w.e.f. 28-01-2010)
|
|
Basic Sale Price (BSP) for apartment sizes less than 2000 sq.ft
|
Rs. 3100/- Psf. |
|
Basic Sale Price (BSP) for apartment sizes more than 2000 sq.ft
|
Rs. 2900/- psf.
|
|
Infrastructure Development Charges
|
Rs. 33/- psf.
|
|
Preferential Location Charges (PLC)
|
- Single PLC : Rs. 100/- psf.
- Two PLCs : Rs. 175/- psf.
- Three PLCs : Rs. 250/- psf.
|
|
PLCs shall be charged for the following units
|
- Ground Floor
- First Floor
- Second Floor
- Corner
- Landscape Facing
|
|
Interest Free Maintenance Security Deposit
|
Rs. 50/- psf. |
|
Within 150 days of allotment
|
10 % BSP |
|
Car Parking Space
|
- Covered : Rs. 2,50,000/- per parking
- Open : Rs. 1,50,000/- per parking
|
|
Club Membership Registration Charges
|
Rs. 60,000/- |
- Basic Price mentioned above are escalation free and exclusive of External Development
Charges (EDC), Infrastructure Development Charges (IDC).
- Any further increase
in EDC and IDC by the Statutory Authorities shall be borne by the Allottee
- The
Company would pay to the Allottee(s) Rs. 5/- per sq. ft. per month of Super Area
for any delay in offering possession of the Apartment beyond the period of 36 months
from the date of execution of the agreement to sell. Similarly, the allottee(s)
would also be liable to pay holding charges @ Rs. 5/- per sq. ft. per month of Super
Area if the allottee(s) fails to take possession of the Apartment within 30 days
from the date of issuance of the notice of possession.
- The Maintenance Charges on the basis of Super Area of the Apartment as determined
by the Company at the time of offer of possession of the Apartment shall be payable
in advance for a period of two years along with the notice of possession.
- Parking:
2BR & 3BR – One covered car parking is mandatory 4 BR – Two covered car parking
are mandatory
- The above Prices / Payment Plans are subject to revision/withdrawal at any time
without notice at the sole discretion of the Company.
|
|
|
|
|
PAYMENTS PLANS (W.E.F. 28-01-2010)
|
|
DOWN PAYMENTS PLANS (Rebate 10% on Basic Sale Price) |
|
At the time of Registration of Application for Allotment
|
10% of BSP
|
|
Within 45 Days Of the date of Registration
|
85% of BSP +PLC + Parking + 50% of CMRC + EDC + IDC
|
|
On Notice Of Possession
|
5% of BSP + 50% of CMRC + Stamp duty charges and other charges as applicable
|
|
CONSTRUCTION LINKED INSTALLMENT PLAN |
|
At the time of Registration of Application for Allotment
|
10% of BSP
|
|
Within 75 days of allotment
|
10% of BSP
|
|
Within 150 days of allotment
|
10% of BSP
|
|
On commencement of construction
|
10% of BSP + 50% of PLC + 25% of EDC & IDC
|
|
#On casting of Ground Floor Roof
|
10% BSP + 50% of PLC + 25% of EDC & IDC
|
|
On casting of Sixth Floor Roof
|
5% of BSP + 50% of Parking + 25% of EDC & IDC
|
|
On casting of Ninth Floor Roof
|
5% of BSP + 50% of Parking
|
|
On casting of Eleventh Floor Roof
|
5% of BSP
|
|
On casting of Top Floor Roof
|
5% of BSP
|
|
On completion of masonry work in the apartment
|
5% of BSP
|
|
On completion of internal plaster within the apartment
|
5% of BSP
|
|
On completion of flooring within apartment
|
5% of BSP
|
|
On notice of possession
|
5% of BSP + 50% of CMRC+ Stamp duty
|
|
BSP = Basic Sale Price, EDC = External Development Charges, CMRC = Club
Membership and Registration Charges IDC = Infrastructure Development Charges , PLC = Preferential
Location Charges
|
|
Other charges include Maintenance Security, Maintenance Charges, Stamp Duty Charges, Registration Fees and other charges payable as per the agreed terms
|
|
# This installment and installments listed hereunder shall become payable on demand irrespective of the serial order in which they are listed
|
|
|
|
|
|
|
|
|
|
|
|