IREO The Grand Arch |
|
 “The
Grand Arch” from Ireo is designed to be Gurgaon’s new landmark residential complex.
Spread over almost 20 acres, ....
|
|
|
 |
|
|
|
|
|
Unitech Nirvana Country2 |
|
 The
Moment has now arrived. Nirvana Country 2 is for those who distinguish themselves
from the masses. Independent,.....
|
|
|
 |
|
|
|
|
|
DLF Park Place |
|
 The
sprawiling 30-acre DLF Park Place has been planned keeping some very important people
in mind. You and your loved ones....
|
|
|
 |
|
|
|
|
|
IREO Uptown |
|
 U‘Ireo
Uptown – Home to young dreams’. 3 side open (2, 3 & 4 BHK) apartments with 10 ft
ceiling height to give .....
|
|
|
 |
|
|
|
|
|
DLF Town Houses |
|
 DLF
has just launched few Townhouses in their recently sold DLF New Town Heights Project
at Sector 86, Gurgaon....
|
|
|
 |
|
|
|
|
|
Commonwealth Games village 2010
|
|
 A
prime location just minutes away from the central business district - Connaught
Place, the Commonwealth Games ....
|
|
|
 |
|
|
|
|
|
Ramprastha The Edge Towers
|
|
 THE
EDGE TOWERS part of Ramprastha City a 151 acres integrated township in sector 37D
Gurgaon...
|
|
|
 |
|
|
|
|
|
DLF Express Greens
|
|
 DLF's
new residential project "Express Greens" in Sector - M1, Manesar, Gurgaon. A reflection
of novel architecture ,....
|
|
|
 |
|
|
|
|
|
|
 |
|
Commercial Projects > Signature Towers II, Gurgaon |
 |
 |
|
Projects style
|
|
Grade ‘A’ Commercial Office Space |
|
Location |
|
Sector 15, NH-8, Gurgaon
|
|
Projects Status |
|
Excavation starting on 14th April 2009 |
|
|
|
|
|
|
Overview
|
Project Details
|
|
Project Name |
: |
Signature Towers II |
|
Project Address |
: |
Sector 15, NH-8, Gurgaon |
|
Project Type |
: |
Grade ‘A’ Commercial Office Space |
|
Total Land Area |
: |
3.76 Acres |
|
Permissible FAR |
: |
1.75 |
|
Total Saleable Area |
: |
3.50 Lacs sq ft (approximately) |
|
Number of Towers |
: |
2 (Proposed) |
|
Number of Floors |
: |
Ground + 10 |
|
Site Status |
: |
Excavation starting on 14th April 2009 |
|
Approach Via
|
: |
NH-8 |
|
|
|
*
|
LEED certified green building
|
|
* |
Located opposite a planned new luxury Hotel in the high growth employment corridor
already home to Top IT/ ITeS & Corporate Giants |
|
* |
Distinctive architecture and environment friendly world class offices |
|
* |
Diverse offering of convenience and lifestyle amenities |
|
* |
Sky Gardens on every third level |
|
* |
Luxurious lobby and toilet finishes |
|
* |
Surrounded by acres of elegantly landscaped gardens and 100 meter Green Belt |
|
* |
Low maintenance external façade |
|
* |
High speed elevators |
|
*
|
Ample, multi-level parking garage |
|
* |
Fully Integrated Building Management System |
|
Specification
|
STRUCTURE |
|
RCC Flat slab structure; maximum column spans to ensure high efficiency
|
|
FINISHES
|
|
External facade : Mix of stone, ACP and Thermal Sensitivity glass
|
|
Double height Atrium with Marble/ granite floor finish
|
|
Finished common Toilets on each floor as per design
|
|
Elevators Finished in Stainless Steel, lighting and ceiling as per design.
|
|
PARKING
|
|
3 Level Basement parking
|
|
Additional parking on surface for visitors as per design.
|
|
Access Control (parking) Control barrier with proposed electronic card swipe
|
|
AIR CONDITIONING
|
|
Centrally air-conditioned building with independent AHU’s for each floor.
Separate AHU’s for common areas.
|
Building Specs
|
POWER BACK-UP |
|
1. Diesel Generators 100% power back-up provided for Lighting, power and AC, with
multiple redundancy.
|
|
COMMUNICATIONS
|
|
1. Spatial and structural provision for installing satellite dish on roof (As per
req.)
|
|
2. Availability of all major service providers.
|
|
3. Voice and Data Risers provided
|
|
4. Proposal for making the building 100% wi-fi enabled under discussion.
|
|
OTHER ITEMS
|
|
1. BMS and Controls System monitoring the principle operations of the building.
|
|
2. Control system fully integrated with the security, fire alarm, and lift control
systems.
|
|
|
|
|
|
|